Blazar
(310) 243-6979 Request an estimate

Electrical contractor in Los Angeles.Quality, transparency, performance.

Licensed electrical contractor

CA License #1162753, C-10

What sets us apart

Most of what goes wrong on an electrical job is avoidable. These are the three things we hold ourselves to.

01

Quality

Work is installed to the California Electrical Code by a licensed C-10 contractor, permitted where required, and inspected before we call it done.

  • CA License #1162753, C-10 Electrical
  • Permits pulled and inspections passed
  • Panels labeled and work photographed
02

Transparency

You get a written, itemized estimate before any work starts, with labor, materials and permit fees on separate lines.

  • Labor, material and permit lines
  • Changes priced before work continues
  • One point of contact throughout
03

Performance

We plan each job around a realistic schedule and keep you updated as it moves. The work is tested before we hand it over.

  • A clear schedule before work starts
  • Work tested before handover
  • A clean, organized job site
Wire nutsStripped wire and heat shrinkLever connectorsCrimp terminalsElectrical tape

Services

One contractor for the full scope of electrical work, from a single circuit to a new service.

All services

Planning

We draw it before we build it. Larger jobs start with a single-line diagram, so you can see every piece of equipment before work begins.

Single-line diagram of an example EV charging site Power flows from the utility service through a pad-mount transformer to a meter and main switchboard. The switchboard feeds two DC fast chargers at 480 volts and a step-down transformer that supplies a 208 volt panel and three dual-port Level 2 chargers. 1 2 3 4 5 D C B A Existingutility service1 2Utility transformerPad-mount, on a new pad 3Meter and main switchboard480/277 V service equipment 4DC fast chargersTwo dispensers, Level 3 5Step-down transformer480 V to 208/120 V 6Distribution panel208/120 V 7Level 2 chargersThree dual-port pedestals 480/277 V, 3-phase 208/120 V, 3-phase KEYED NOTES 1Utility serviceService request, load calculationsand inspections with LADWP or SCE. 2Utility transformerPad, grounding and primary conduitbuilt to the utility's standards. 3Meter and main switchboardService equipment set, terminated,torqued and labeled. 4DC fast chargersFeeders, mounting, commissioningand network activation. 5Step-down transformerBrings 480 V down to 208/120 V forLevel 2 charging and general loads. 6Distribution panelA dedicated breaker per chargerand a typed panel schedule. 7Level 2 chargersDual-port pedestals, protectivebollards and stall layout. LEGEND New feeder Existing utility Circuit breaker Termination SHEET TITLE Single-line diagram Example EV charging site CA LICENSEC-10 #1162753 SHEETE-1 STATUSIllustrative
Single-line diagram of an example EV charging site Power flows from the utility service through a pad-mount transformer to a meter and main switchboard. The switchboard feeds two DC fast chargers at 480 volts and a step-down transformer that supplies a 208 volt panel and three dual-port Level 2 chargers. Existingutility service1 2Utility transformerPad-mount, on a new pad 3Meter and main switchboard480/277 V service equipment 4DC fast chargersTwo dispensers, Level 3 5Step-down transformer480 V to 208/120 V 6Distribution panel208/120 V 7Level 2 chargersThree dual-port pedestals 480/277 V, 3-phase 208/120 V, 3-phase LEGEND New feeder Existing utility Circuit breaker Termination Single-line diagram Example EV charging site Sheet E-1, C-10 #1162753
  1. Utility service

    Service request, load calculations and inspections with LADWP or SCE.

  2. Utility transformer

    Pad, grounding and primary conduit built to the utility's standards.

  3. Meter and main switchboard

    Service equipment set, terminated, torqued and labeled.

  4. DC fast chargers

    Feeders, mounting, commissioning and network activation.

  5. Step-down transformer

    Brings 480 V down to 208/120 V for Level 2 charging and general loads.

  6. Distribution panel

    A dedicated breaker per charger and a typed panel schedule.

  7. Level 2 chargers

    Dual-port pedestals, protective bollards and stall layout.

Example single-line diagram for a commercial EV charging site. Select a component to see our scope.Illustrative only. Every project gets its own.

How a job runs

The same four steps on every job, whether it takes an afternoon or a month.

1

Site walk

We look at the existing service and panel, and ask what you need the power to do.

2

Itemized estimate

A written scope and price, line by line. Nothing starts until you approve it.

3

Permit and install

We pull the permit, schedule the work and keep you updated as it progresses.

4

Final inspection

The work is inspected and tested, and you get photos and an updated panel schedule.

Have a job in mind? Tell us about it and we will come take a look.

We use your details only to reply about this job. Privacy