Blazar
(310) 243-6979 Request an estimate

Panel upgrades in Los Angeles.

An undersized or aging panel limits everything else you want to do, from an EV charger to a kitchen remodel. We replace panels, increase service capacity and relocate meters, and we deal with the permit and the utility for you.

What is included

  • Load calculation to size the new service
  • Permit through LADBS or your local building department
  • Coordination with LADWP or SCE for the disconnect and reconnect
  • New panel, breakers, grounding and bonding to current code
  • Every circuit labeled, with a typed panel schedule
  • Inspection and final sign-off

Signs you need one

  • Breakers trip when several appliances run
  • You are adding an EV charger, heat pump, induction range or ADU
  • The panel is a fuse box or an obsolete or recalled model
  • Lights dim when large equipment starts
  • An insurer or home inspector flagged the panel
  • There is no room left for new circuits

How the price is built

Your estimate lists the panel and breakers, labor, permit fees and any patching as separate lines. If the utility needs work on its side of the meter, we tell you before anything starts.

Common questions

How long is the power off during a panel upgrade?

Most residential panel replacements are finished in one working day, with the power off for part of that day. Service upgrades that need utility work can take longer, and we walk you through the schedule beforehand.

Do I need a permit to replace a panel in Los Angeles?

Yes. Panel replacements and service upgrades need an electrical permit and an inspection. We pull the permit and meet the inspector.

Can I add an EV charger without upgrading my panel?

Often, yes. A load calculation shows how much capacity is available, and load management devices can share capacity between a charger and other appliances. We check this before recommending an upgrade.

Planning a panel upgrade? Tell us what you are adding.

We use your details only to reply about this job. Privacy