Blazar
(310) 243-6979 Request an estimate

EV charger installation in Los Angeles.

We install Level 2 chargers at homes, and Level 2 and DC fast charging at multifamily buildings, workplaces and fleet yards. Every installation starts with a load calculation, so the charger fits the service you have.

What is included

  • Load calculation and panel assessment
  • Dedicated circuit sized to the charger
  • Hardwired or plug-in installation
  • Load management where capacity is limited
  • Permit and inspection
  • Charger setup and a walkthrough of the app

Where we install

  • Single-family homes and garages
  • Condominiums and apartment buildings
  • Workplaces and retail parking
  • Fleet yards and depots
  • Carports, driveways and detached garages
  • Sites that need trenching or a new service

How the price is built

Home installations are priced from the distance between the panel and the charger, the circuit size and whether load management is needed. Commercial sites get a single-line diagram and a line-by-line estimate.

What a commercial site looks like

Multifamily, workplace and fleet projects start with a single-line diagram like this one, so every piece of equipment and its cost is visible before work begins.

Single-line diagram of an example EV charging site Power flows from the utility service through a pad-mount transformer to a meter and main switchboard. The switchboard feeds two DC fast chargers at 480 volts and a step-down transformer that supplies a 208 volt panel and three dual-port Level 2 chargers. 1 2 3 4 5 D C B A Existingutility service1 2Utility transformerPad-mount, on a new pad 3Meter and main switchboard480/277 V service equipment 4DC fast chargersTwo dispensers, Level 3 5Step-down transformer480 V to 208/120 V 6Distribution panel208/120 V 7Level 2 chargersThree dual-port pedestals 480/277 V, 3-phase 208/120 V, 3-phase KEYED NOTES 1Utility serviceService request, load calculationsand inspections with LADWP or SCE. 2Utility transformerPad, grounding and primary conduitbuilt to the utility's standards. 3Meter and main switchboardService equipment set, terminated,torqued and labeled. 4DC fast chargersFeeders, mounting, commissioningand network activation. 5Step-down transformerBrings 480 V down to 208/120 V forLevel 2 charging and general loads. 6Distribution panelA dedicated breaker per chargerand a typed panel schedule. 7Level 2 chargersDual-port pedestals, protectivebollards and stall layout. LEGEND New feeder Existing utility Circuit breaker Termination SHEET TITLE Single-line diagram Example EV charging site CA LICENSEC-10 #1162753 SHEETE-1 STATUSIllustrative
Single-line diagram of an example EV charging site Power flows from the utility service through a pad-mount transformer to a meter and main switchboard. The switchboard feeds two DC fast chargers at 480 volts and a step-down transformer that supplies a 208 volt panel and three dual-port Level 2 chargers. Existingutility service1 2Utility transformerPad-mount, on a new pad 3Meter and main switchboard480/277 V service equipment 4DC fast chargersTwo dispensers, Level 3 5Step-down transformer480 V to 208/120 V 6Distribution panel208/120 V 7Level 2 chargersThree dual-port pedestals 480/277 V, 3-phase 208/120 V, 3-phase LEGEND New feeder Existing utility Circuit breaker Termination Single-line diagram Example EV charging site Sheet E-1, C-10 #1162753
  1. Utility service

    Service request, load calculations and inspections with LADWP or SCE.

  2. Utility transformer

    Pad, grounding and primary conduit built to the utility's standards.

  3. Meter and main switchboard

    Service equipment set, terminated, torqued and labeled.

  4. DC fast chargers

    Feeders, mounting, commissioning and network activation.

  5. Step-down transformer

    Brings 480 V down to 208/120 V for Level 2 charging and general loads.

  6. Distribution panel

    A dedicated breaker per charger and a typed panel schedule.

  7. Level 2 chargers

    Dual-port pedestals, protective bollards and stall layout.

Example single-line diagram for a commercial EV charging site. Select a component to see our scope.Illustrative only. Every project gets its own.

Common questions

What is the difference between Level 1, Level 2 and DC fast charging?

Level 1 uses a standard 120 V outlet and adds a few miles of range per hour. Level 2 uses a 240 V circuit and typically refills a battery overnight. DC fast charging uses 480 V three-phase power and is built for commercial sites.

How much power does a home charger need?

Most home chargers run on a 40 to 60 amp, 240 V circuit. The right size depends on your vehicle, your driving and the capacity of your panel.

Are there rebates for EV chargers in Los Angeles?

LADWP and other utilities have offered rebates for home and commercial chargers. Programs change, so check the current terms with your utility. We provide the permit and invoice documents that rebate applications ask for.

Ready for a charger? Tell us about the vehicle and the parking spot.

We use your details only to reply about this job. Privacy